Analysis of installation process of pneumatic diaphragm pump

Views: Update time:2021-01-19

Analysis of installation process of pneumatic diaphragm pump

1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

Analysis of installation process of pneumatic diaphragm pump(圖1)

Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

粵ICP備2020110751號

主站蜘蛛池模板: 日韩国产综合在线 | 99在线视频免费观 | 午夜理论 | 亚洲成a人一区二区三区 | 色婷婷色综合 | 尤物视频在线播放 | 欧美激情在线日韩 | 国产高跟黑色丝袜在线 | 国产视频二区 | 免费看成人AA片无码视频App | 91精品亚洲欧美日韩在线 | 91人妻人人揉人人操人人 | 高清亚洲香蕉在线播放av | 亚洲视频专区 | 99re16热视频精品 | 在线3级片 | 91嫩草国产线免费观看91 | 午夜a级理 | 97精品人妻无码专区在线 | 国产suv精品一区二区6 | 日本香港三级在线观看 | 国产一级 片内射免费视频播放 | 免费看一 | 国产片一区 | 在线观看av网站永久免费观看 | av天堂最新手机网址 | 无码人妻精品一区 | av无码精品一区二区三区宅噜噜 | 欧美综合亚洲日韩精品区 | 亚洲重口无码av影院 | 亚洲AV无码一区二区二三区流氓 | 一区二区三区理伦A片 | 亚 洲 成 人 网 站在线观看 | 91在线精品亚洲一区二区 | 天堂√最新版中文在线 | 欧美人与性另类 | 制服丝袜第一页在线 | 国产三级在线观看视频网址 | 亚洲熟女自拍偷拍 | 波多野结衣av三区 | 日韩制服丝袜在线视 |